Electrical · Renewable energy · Final year project
Hybrid Inverter With Solar Battery Charging
An inverter that charges its battery from both solar and mains power. When mains is available it powers the load and charges the battery; during a power cut the inverter runs the load from the battery, which the solar panel also charges.
What is the Hybrid Inverter With Solar Battery Charging project?
An inverter that charges its battery from both solar and mains power. When mains is available it powers the load and charges the battery; during a power cut the inverter runs the load from the battery, which the solar panel also charges.
Key facts
- Branch
- Electrical Engineering (EE / EEE); also suits E&TC / ECE
- Type
- Final year project · Advanced
- Suitable for
- Diploma capstone and B.E / B.Tech final year
- Build time
- 6 to 8 weeks
- Estimated component cost
- ₹4,300 – ₹6,300
- Guidance from
- ₹9,999 (Hardware / IoT Final Year)
How the Hybrid Inverter With Solar Battery Charging works
- Solar panel and Voltage regulator / buck converter supply the circuit; a regulator gives the controller and sensors a steady 5 V.
- The Push buttons and switches provide manual inputs and the power switch.
- The Arduino Uno R3 reads the inputs, runs the decision logic written in C/C++ and drives the outputs.
- The Relay module switches mains or high-current loads such as lamps, pumps and fans from a low-voltage signal.
- The Motor driver lets the low-current controller run the motors forward, reverse and at variable speed.
- The 16×2 LCD with I2C adapter shows readings, status and messages to the user.
- The LEDs indicate status.
Block diagram
Inputs
Push buttons and switchesController
Arduino Uno R3Outputs
Relay moduleMotor driver16×2 LCD with I2C adapterLEDsComponents list and cost
Typical prices from Indian online stores and electronics markets (Lamington Road, Budhwar Peth, SP Road). Buy from one store where you can to save on shipping.
| Component | Qty | What it does | Approx. cost |
|---|---|---|---|
| Arduino Uno R3 | 1 | Reads the inputs, runs the decision logic written in C/C++ and drives the outputs. | ₹550 |
| Push buttons and switches | 1 | Provide manual inputs and the power switch. | ₹40 |
| Relay module | 1 | Switches mains or high-current loads such as lamps, pumps and fans from a low-voltage signal. | ₹70 |
| Motor driver (L298N) | 1 | Lets the low-current controller run the motors forward, reverse and at variable speed. | ₹180 |
| 16×2 LCD with I2C adapter | 1 | Shows readings, status and messages to the user. | ₹220 |
| LEDs (assorted) | 1 | Indicate status. | ₹20 |
| Solar panel (10–20 W) | 1 | Converts sunlight into electricity to power or charge the system. | ₹900 |
| Voltage regulator / buck converter | 1 | Provides a steady voltage to the controller and sensors. | ₹80 |
| 12 V power adapter / step-down transformer | 1 | Supplies stable low-voltage power from the mains. | ₹250 |
| Charge controller module | 1 | Charges the battery safely and stops overcharging. | ₹250 |
| Rechargeable battery (12 V 1.3–7 Ah) | 1 | Stores energy and supplies power when mains is absent. | ₹650 |
| Load (Lamp) | 1 | Part from the design specification | ₹150* |
| Passive components, PCB and wiring kit | 1 | ICs and IC sockets, crystal oscillator, resistors (assorted), capacitors (assorted), transistors / MOSFETs, cables, connectors and jumper wires, diodes and PCB / breadboard. | ₹445 |
| Wiring, PCB, soldering and enclosure | 1 | Project overhead | ₹450 |
| Demo model base / mounting board | 1 | Project overhead | ₹500 |
| Testing spares and replacements | 1 | Project overhead | ₹300 |
| Estimated total | Varies with brand, quality and city | ₹4,300 – ₹6,300 |
Prices are estimates for budgeting; items marked * depend on the exact size or model chosen. We confirm the bill of materials when your design is frozen, and components are charged at actual cost with bills.
How much does this project cost?
| Option | What you get | Cost |
|---|---|---|
| Components only | You buy the parts and build it yourself | ₹4,300 – ₹6,300 |
| Hardware / IoT Final Year | Working model or guided build, Circuit diagram and bill of materials, Firmware / code with explanation | from ₹9,999 + components |
| Capstone Project (CPE) | Working project or model, Black book in MSBTE format, Step-by-step explanation | ₹9,999 + components |
| Diploma ITR | 100% working source code, Project report PDF, PPT | ₹1,999 + components |
No GST and no hidden charges. Use the cost calculator for a quote with your deadline and add-ons, or see all plans.
Download the project brief (PDF)
Summary, working, components and cost and viva questions on one branded PDF to show your guide or team. To get it developed, contact us on WhatsApp.
What you submit with this project
- Working model with circuit diagram and program code
- Project report or black book in your university's chapter order (block diagram, circuit, calculations, results)
- Presentation for the review and final viva
- Synopsis for topic approval, if your college asks for one
Electrical viva questions on this project
What is the aim of the Hybrid Inverter With Solar Battery Charging project?
An inverter that charges its battery from both solar and mains power. When mains is available it powers the load and charges the battery; during a power cut the inverter runs the load from the battery, which the solar panel also charges.
Explain the working of your project in short.
Solar panel and Voltage regulator / buck converter supply the circuit; a regulator gives the controller and sensors a steady 5 V. The Push buttons and switches provide manual inputs and the power switch. The Arduino Uno R3 reads the inputs, runs the decision logic written in C/C++ and drives the outputs. The Relay module switches mains or high-current loads such as lamps, pumps and fans from a low-voltage signal.
What microcontroller is on the Arduino Uno and what are its key specifications?
The Uno uses the ATmega328P: 8-bit, 16 MHz clock, 32 KB flash, 2 KB SRAM, 14 digital I/O pins (6 PWM) and 6 analog inputs with a 10-bit ADC.
Why is a pull-up resistor needed with a push button?
Without it the input pin floats and reads random values. The pull-up keeps it HIGH until the button connects it to ground.
Why is a relay used?
It electrically isolates the 5 V control circuit from the high-voltage load. The controller energises the coil through a transistor, and the contacts switch the load.
Why can't the motor be connected directly to the microcontroller?
A motor needs far more current (hundreds of mA to amps) than a controller pin can supply (about 20–40 mA). The H-bridge driver switches the motor current and allows direction control.
Why is an I2C adapter used with the LCD?
It reduces the wiring from about 10 pins to 2 (SDA and SCL), leaving more controller pins free for sensors.
How did you calculate the power rating of your system?
Using P = V × I for each load, adding a margin of 20 to 25%. The solar panel is sized from the daily energy need divided by about 5 peak sun hours in India. Battery capacity is the energy needed per day divided by the battery voltage and allowable depth of discharge.
What protection have you provided in the circuit?
A fuse against short circuit, relays or optocouplers to isolate the control side from the power side, flyback diodes across inductive loads such as relays and motors, and software limits that cut off on over-current or over-voltage.
What is the efficiency of your system and how did you measure it?
Efficiency = output power ÷ input power × 100. We measured input and output voltage and current with a multimeter at different loads and tabulated the results in the report.
Explain the block diagram of your project.
The input section senses the real-world quantity, the Arduino Uno R3 processes it according to the program, and the output section displays the result and drives the actuators. The power supply section feeds every block.
Related projects
Academic use: Project Buddyy offers mentoring, guidance and reference material for learning. You stay responsible for following your institution's academic integrity rules and for understanding everything you submit.
Want to build Hybrid Inverter With Solar Battery Charging?
Send your college, deadline and team size. We confirm the scope, cost and what you will submit.
