E&TC / ECE · Solar and power electronics · Final year project

Automatic Bubble Maker With Speed Control

A motorised soap bubble machine with two speed settings. A rotating wheel dips into soap solution and a blower creates bubbles continuously, powered by a battery.

Components & cost

What is the Automatic Bubble Maker With Speed Control project?

A motorised soap bubble machine with two speed settings. A rotating wheel dips into soap solution and a blower creates bubbles continuously, powered by a battery.

Key facts

Type
Final year project · Intermediate
Suitable for
Diploma capstone and B.E / B.Tech final year
Build time
4 to 6 weeks
Estimated component cost
₹5,300 – ₹7,700
Guidance from
₹9,999 (Hardware / IoT Final Year)

How the Automatic Bubble Maker With Speed Control works

  1. Rechargeable battery supplies the circuit; a regulator gives the controller and sensors a steady 5 V.
  2. The Microcontroller board processes sensor inputs and controls the outputs according to the program.
  3. The DC geared motor provides the driving motion.
  4. The DC cooling fan moves air for cooling or ventilation.

Block diagram

Components list and cost

Typical prices from Indian online stores and electronics markets (Lamington Road, Budhwar Peth, SP Road). Buy from one store where you can to save on shipping.

ComponentQtyWhat it doesApprox. cost
Microcontroller board1Processes sensor inputs and controls the outputs according to the program.₹400
DC geared motor2Provides the driving motion.₹500
DC cooling fan (12 V)1Moves air for cooling or ventilation.₹120
Rechargeable battery (12 V 1.3–7 Ah)1Stores energy and supplies power when mains is absent.₹650
Mild steel frame and fabrication1Forms the main structure that holds all parts.₹2,500
Liquid Tub1Part from the design specification₹150*
Passive components, PCB and wiring kit1Enclosure, mounts and fasteners, resistors (assorted), capacitors (assorted), PCB / breadboard and cables, connectors and jumper wires.₹610
Wiring, PCB, soldering and enclosure1Project overhead₹450
Demo model base / mounting board1Project overhead₹500
Testing spares and replacements1Project overhead₹300
Estimated totalVaries with brand, quality and city₹5,300 – ₹7,700

Prices are estimates for budgeting; items marked * depend on the exact size or model chosen. We confirm the bill of materials when your design is frozen, and components are charged at actual cost with bills.

How much does this project cost?

OptionWhat you getCost
Components onlyYou buy the parts and build it yourself₹5,300 – ₹7,700
Hardware / IoT Final YearWorking model or guided build, Circuit diagram and bill of materials, Firmware / code with explanationfrom ₹9,999 + components
Capstone Project (CPE)Working project or model, Black book in MSBTE format, Step-by-step explanation₹9,999 + components
Diploma ITR100% working source code, Project report PDF, PPT₹1,999 + components

No GST and no hidden charges. Use the cost calculator for a quote with your deadline and add-ons, or see all plans.

Download the project brief (PDF)

Summary, working, components and cost and viva questions on one branded PDF to show your guide or team. To get it developed, contact us on WhatsApp.

WhatsApp us

What you submit with this project

  • Working model with circuit diagram and program code
  • Project report or black book in your university's chapter order (block diagram, circuit, calculations, results)
  • Presentation for the review and final viva
  • Synopsis for topic approval, if your college asks for one

E&TC / ECE viva questions on this project

What is the aim of the Automatic Bubble Maker With Speed Control project?

A motorised soap bubble machine with two speed settings. A rotating wheel dips into soap solution and a blower creates bubbles continuously, powered by a battery.

Explain the working of your project in short.

Rechargeable battery supplies the circuit; a regulator gives the controller and sensors a steady 5 V. The Microcontroller board processes sensor inputs and controls the outputs according to the program. The DC geared motor provides the driving motion. The DC cooling fan moves air for cooling or ventilation.

What is the difference between a microprocessor and a microcontroller?

A microprocessor is only a CPU and needs external memory and I/O chips. A microcontroller has the CPU, RAM, ROM, timers and I/O on a single chip, which makes it cheaper and better for dedicated control tasks.

Why is a geared motor used?

The gearbox reduces speed and multiplies torque, so a small DC motor can move a vehicle or mechanism smoothly. Torque increases roughly by the gear ratio.

How can fan speed be varied?

With PWM through a MOSFET: changing the duty cycle changes the average voltage and therefore the speed.

How do you calculate battery backup time?

Backup time (hours) ≈ battery capacity (Ah) × voltage × 0.8 efficiency ÷ load power (W). For example, 12 V 7 Ah at 20 W gives about 3.3 hours.

Why is mild steel used for the frame?

It is cheap, strong, easy to cut and weld and widely available. A frame of 25 mm square pipe is enough for most student models.

Explain the block diagram of your project.

The input section senses the real-world quantity, the Microcontroller board processes it according to the program, and the output section displays the result and drives the actuators. The power supply section feeds every block.

Which communication protocols are used between the modules?

The sensors give digital or analog signals read directly by the controller's I/O and ADC pins, and outputs are driven through transistor or relay drivers.

What is the operating voltage of the circuit?

The controller and most sensors work at 5 V (ESP boards and some modules at 3.3 V). The battery powers the board, and a regulator steps it down. Motors and relays get their own supply line so they do not reset the controller.

Academic use: Project Buddyy offers mentoring, guidance and reference material for learning. You stay responsible for following your institution's academic integrity rules and for understanding everything you submit.

Want to build Automatic Bubble Maker With Speed Control?

Send your college, deadline and team size. We confirm the scope, cost and what you will submit.